Every sector has a unique set of requirements for effective buildings. Its safety, sustainability, visual aspect, building performance & efficiency. Delivering bespoke solutions that meet the demands and legislation of your sector is deep-rooted in our DNA. Our sector experience and accreditations allow us to be a valued service and product provider while guiding you to informed decision making.

Browse our project profiles which demonstrate our sector support and project capability.

Articles tagged with: Technical Survey

Ezeflow, West Lothian

Ezeflow, West Lothian

Removal and disposal of 3,750 m2 of profiled wall cladding containing an asbestos coating and replaced with a new Plastisol Coated profiled sheet. The new cladding enhanced the natural daylight entering the building by 30% and allowed a substantial increase in thermal efficiency, producing significant energy savings.

Drinks Production Plant, Hereford

Drinks Production Plant, Hereford

Our client inherited the Hereford site after acquiring several brands. The site required some upgrading, including the CO2 recovery unit. The refurbishment of the CO2 recovery unit building had a time-critical completion day due to the new CO2 plant equipment arriving from Mainland Europe that had no flexibility on the delivery date.

Taylor High School

Taylor High School

Sixteen-week mansard roof panel replacement project for local authority high school, completed during term-time.

Hinckley Distribution Centre

Hinckley Distribution Centre

Starfish Construction carried out a technical survey to pinpoint major issues with the roof and installed a new system with a predicted 40-year lifespan.

Scottish Water, Gowans Terrace

Scottish Water, Gowans Terrace

This project’s original scope of works included installing a new curtain walling system to the building’s main entrance and removing the existing stone cladding panels, which were a risk because sections were coming loose. Additionally, it required replacing 350 m2 of the flat roof above the offices.